New Manufacturing Facility

Design/build/commissioning of a new manufacturing facility of single-use products to be used in gene therapy and bioprocess manufacturing facilities. Project included the master planning of the 210,000 sf facility, and the design of the fit-out of this facility in three phases. The development phases are developed concurrent with ongoing manufacturing operations.

South Carolina

Completion Date: Oct 2021 (Phase 1); Dec 2021 (Phase 2)

Square Feet: 24,000 (Phase 1); 19,000 (Phase 2)

SPECIAL DETAILS

 

Self-supported box-in-box solution, using a cold-formed structural steel trellis frame to independently support all utilities and systems independent of the building structure.

 

PROJECT HIGHLIGHTS

  • Master plan, concept and Phase 1 detailed design developed in 6 weeks.
  • Hybrid modular system installation using 1⁄2” liner panels on steel studs and 2” modular wall panels.
  • Composite structural deck on cold-formed steel studs to support air handlers and utilities